Section 174 Research Expensing Is Back for Contractors

Writer: Paramita Bhattacharya
Paramita Bhattacharya
Nov 2
5 min read

For three tax years, many businesses that did any kind of technical design work had to capitalize those costs and deduct them slowly over several years. The One Big Beautiful Bill Act (OBBBA), signed July 4, 2025, reversed that for domestic work. Section 174 research expensing is back for tax years beginning after December 31, 2024, and the new rules are often referred to as Section 174A.

If your company does design-build work, engineers MEP systems, develops prefabricated assemblies, or claims the R&D tax credit, this change affects your return. It also gives you choices about how to recover costs you capitalized in 2022, 2023, and 2024.

Why Section 174 Research Expensing Matters to Contractors

Section 174 covers research and experimental costs, which are costs tied to developing or improving a product or process where there is technical uncertainty. For a commercial contractor, that can include:

  • Engineering time to design a new mechanical or electrical system layout

  • Developing new prefab or modular assemblies

  • Testing a new installation method through mock-ups

  • BIM modeling used to work out unresolved design problems

These are often the same activities that support the Section 41 R&D tax credit. The credit and the deduction are separate rules, but they look at overlapping costs, so they need to be planned together.

What Changed Under OBBBA

Here is the short version:

  • Domestic research costs: immediately deductible again for tax years beginning after December 31, 2024.

  • Foreign research costs: still amortized over 15 years. If you use engineering or design firms outside the United States, those costs stay on the slow track.

  • Unamortized 2022 to 2024 domestic costs: taxpayers may choose to deduct the remaining balance over 1 or 2 years, starting with the 2025 tax year, instead of continuing the original schedule.

  • Retroactive relief for small businesses: businesses that met the gross receipts test for that year ($31 million) could elect to apply the new rules back to 2022 by amending returns. That election deadline was July 4, 2026, and it has now passed.

If you made the small business election in time, you should already see the effects in your amended returns. If you did not, the catch-up options on your 2025 and later returns are the remaining path.

The Catch-Up Options for 2022 to 2024 Costs

Many contractors still carry an unamortized balance of domestic research costs from those three years. The choices are:

  1. Keep the original schedule. Continue deducting the balance as originally planned.

  2. Deduct the remaining balance in one year, starting with 2025.

  3. Spread the remaining balance over two years, starting with 2025.

Which one is best depends on your income in each year, your tax bracket, and other moves you are planning, such as large equipment purchases.

Example

A commercial electrical contractor capitalized domestic research costs in 2022 through 2024 for design work on prefab conduit racks and design-build projects. At the start of 2025, $240,000 of those costs had not yet been deducted.

  • One-year choice: deduct $240,000 on the 2025 return.

  • Two-year choice: deduct $120,000 on the 2025 return and $120,000 on the 2026 return ($240,000 / 2 = $120,000).

If 2025 was a strong profit year and 2026 looks similar, the two-year option may smooth taxable income. If 2025 was the peak year, the one-year option may make more sense. Since most 2025 returns have now been filed, confirm what was chosen on your return and how the remaining balance, if any, flows into 2026.

Coordinating With the R&D Credit

The R&D credit reduces tax dollar for dollar, and Section 174 expensing reduces taxable income. Using both can be powerful, but there are interactions:

  • The credit and the deduction draw on overlapping costs, so your research cost study should support both.

  • There are rules that can reduce the deduction or the credit to avoid a double benefit. Your tax preparer should model both approaches before filing.

  • Good records, such as time tracking for engineers and BIM staff, design files, and mock-up reports, support both.

Other Ripple Effects on Your Return

Bigger deductions in a given year can change other calculations:

  • QBI deduction: larger research deductions lower qualified business income, which can lower the 20% Section 199A deduction for pass-through owners.

  • Business interest limit: OBBBA restored the EBITDA-based calculation for Section 163(j), and small businesses under the $32 million gross receipts test for 2026 are exempt from 163(j) altogether.

  • Excess business loss limits: if a large deduction creates a loss, the excess business loss rules (now permanent) may limit how much offsets other income, with the excess carried forward.

  • State returns: states do not always follow federal changes. Some may still require capitalization of research costs. Check each state where you file.

Practical Steps Before Year End

  • Identify your 2026 research costs. Ask project managers to flag design and testing work on current jobs.

  • Separate domestic from foreign. Sort out any offshore drafting, modeling, or engineering vendors.

  • Confirm your 2022 to 2024 balance. Know what remains unamortized and what was chosen on your 2025 return.

  • Model the interaction with equipment purchases, bonus depreciation, and the QBI deduction.

  • Review state conformity for every state where you have nexus.

How This Connects to Your Bonding

Your surety relies on your reviewed or audited financial statements, which follow GAAP rather than tax rules. Under GAAP, many design costs are expensed or included in contract costs regardless of Section 174. That means the tax change mostly affects your tax liability, not your reported profit.

Where it shows up for your surety is cash. A lower tax bill can improve working capital, which underwriters watch closely. If your financial statements include an income tax provision (for example, in a C corporation or for entity-level state taxes), make sure it reflects the new rules so your statements do not overstate taxes owed.

FAQ

When did section 174 research expensing come back?

The OBBBA change restoring immediate expensing for domestic research costs applies to tax years beginning after December 31, 2024. Foreign research costs are still amortized over 15 years.

Can I still amend 2022 to 2024 returns for Section 174?

The retroactive election for small businesses had a deadline of July 4, 2026, which has passed. Contractors who did not make it can still use the option to deduct remaining unamortized domestic costs over 1 or 2 years starting with 2025.

Do contractors really have Section 174 costs?

Many do. Design-build engineering, MEP system design, prefab development, and testing new installation methods can all involve research costs. Whether a cost qualifies depends on the technical uncertainty involved and how the work is structured.

Talk to a Contractor Tax Specialist

Section 174 changes affect your deduction timing, your R&D credit, and your QBI deduction all at once. Book a 30-minute call to review where your research costs stand and what remains to be recovered. Payless Taxes works with bonded commercial contractors from $5M to $50M in revenue nationwide.

This article is general information, not tax or legal advice. Tax rules change and depend on your specific facts. Talk with a qualified tax professional before acting.